More Resources
-
February 1, 2011Energy storage systems have the potential to extend and optimize the operating capabilities of the grid, since power can be stored and used at a later time. This allows for flexibility in generation and distribution, improving the economic efficiency and utilization of the entire system while making the grid more reliable and robust. Additionally, alternatives to traditional power generation, including variable wind and solar energy technologies, may require back-up power storage. Thus, modernizing the power grid may require a substantial volume of electrical energy storage (EES).Office of Electricity
-
February 1, 2011Loan to Severstal Dearborn, Inc., for Advanced Technology Vehicles Manufacturing Project in Dearborn, MichiganOffice of NEPA Policy and Compliance
-
February 1, 2011The Department of Energy is launching an initiative to enhance cyber security on the electric grid. The initiative, led by the Department’s Office of Electricity Delivery and Energy Reliability (OE), the National Institute of Standards and Technology, and the North American Electric Reliability Corporation, will be an open collaboration with representatives from across the public and private sectors to develop a cyber security risk management process guideline for the electric sector.Office of Electricity
-
February 1, 2011Forest Grove Substation ExpansionCX(s) Applied: B4.6Date: 02/01/2011Location(s): Washington County, OregonOffice(s): Bonneville Power AdministrationOffice of NEPA Policy and Compliance
-
DocumentFebruary 1, 2011The foundation of the Savannah River Site (SRS) community involvement program is the belief that members of the public have a right to know what...Savannah River Site
-
DocumentJanuary 31, 2011This is a request by CUMMINS POWER GENERATION CORP for a DOE waiver of domestic and foreign patent rights under agreement DE-EE0003392Office of the General Counsel
-
January 31, 2011Chrysler Group Limited Liability Company Retooling, Reequipping, and Engineering Integration at Various United States Facilities ‐ Retooling #7 CX(s) Applied: B1.31 Date: 01/31/2011 Location(s): Michigan, Indiana, Illinois, Ohio Offices(s): Advanced...Office of NEPA Policy and Compliance
-
January 31, 2011Chrysler Group Limited Liability Company Retooling, Reequipping, and Engineering Integration at Various United States Facilities ‐ Retooling #6 CX(s) Applied: B1.31 Date: 01/31/2011 Location(s): Michigan, Indiana, Illinois, Ohio Offices(s): Advanced...Office of NEPA Policy and Compliance
-
January 31, 2011Chrysler Group Limited Liability Company Retooling, Reequipping, and Engineering Integration at Various United States Facilities ‐ Retooling #5 CX(s) Applied: B1.31 Date: 01/31/2011 Location(s): Michigan, Indiana, Illinois, Ohio Offices(s): Advanced...Office of NEPA Policy and Compliance