Eleven Soil Bores Along the M-Area Abandoned Process Sewer Line for Vadose Zone Characterization CX(s) Applied: B3.1 Date: 05/19/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
May 19, 2014Eleven Soil Bores Along the M-Area Abandoned Process Sewer Line for Vadose Zone Characterization
CX(s) Applied: B3.1
Date: 05/19/2014
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Environmental Compliance & Area Completion Projects (EC&ACP) will advance 11 soil bores to depths ranging from 20' to 120' to ascertain the current concentration of volatile organic compounds (VOCs) along the M-Area Abandoned Process Sewer Line (MAPSL.). The Savannah River National Laboratory (SRNL) cone penetrometer test (CPT) truck will be used to advance the bores.
CX(s) Applied: B3.1
Date: 05/19/2014
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Environmental Compliance & Area Completion Projects (EC&ACP) will advance 11 soil bores to depths ranging from 20' to 120' to ascertain the current concentration of volatile organic compounds (VOCs) along the M-Area Abandoned Process Sewer Line (MAPSL.). The Savannah River National Laboratory (SRNL) cone penetrometer test (CPT) truck will be used to advance the bores.