Demolition and Removal (D&R) of FTF Change Shack 242-12F CX(s) Applied: B1.23 Date: 05/30/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
May 30, 2014Demolition and Removal (D&R) of FTF Change Shack 242-12F
CX(s) Applied: B1.23
Date: 05/30/2014
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Construction Services will demolish and remove the change shack (242-12F) located north of the 2F Evaporator. This building is being demolished due to fire damage. This building will be replaced with a portable change shack.
CX(s) Applied: B1.23
Date: 05/30/2014
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Construction Services will demolish and remove the change shack (242-12F) located north of the 2F Evaporator. This building is being demolished due to fire damage. This building will be replaced with a portable change shack.