Custer-Ingledow Access Road Maintenance CX(s) Applied: B1.3 Date: 05/14/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
May 14, 2014Custer-Ingledow Access Road Maintenance
CX(s) Applied: B1.3
Date: 05/14/2014
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to conduct road maintenance on an existing BPA easement access road within the Custer-Ingledow 500-kilovolt right-of-way (ROW) from structures 9/4 to 9/6.
CX(s) Applied: B1.3
Date: 05/14/2014
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to conduct road maintenance on an existing BPA easement access road within the Custer-Ingledow 500-kilovolt right-of-way (ROW) from structures 9/4 to 9/6.