CX-012367: Categorical Exclusion Determination

Naselle-Tarlett #1 Access Road Maintenance CX(s) Applied: B1.3 Date: 05/14/2014 Location(s): Washington Offices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

May 14, 2014
Estimated Read Time   min
Naselle-Tarlett #1 Access Road Maintenance
CX(s) Applied: B1.3
Date: 05/14/2014
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to maintain an existing access road in the 16th mile of the BPA Naselle-Tarlett No. 1 transmission line.