Facility Safety and Environmental Improvements CX(s) Applied: B2.6 Date: 06/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Office of NEPA Policy and Compliance
June 3, 2014Facility Safety and Environmental Improvements
CX(s) Applied: B2.6
Date: 06/03/2014
Location(s): Washington
Offices(s): River Protection-Richland Operations Office
CH2MHill Plateau Remediation Company and its subcontractors perform safety and environmental improvements of a facility (including but not limited to, replacement and upgrade of facility components) that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed.
CX(s) Applied: B2.6
Date: 06/03/2014
Location(s): Washington
Offices(s): River Protection-Richland Operations Office
CH2MHill Plateau Remediation Company and its subcontractors perform safety and environmental improvements of a facility (including but not limited to, replacement and upgrade of facility components) that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed.