NREL National Wind Technology Center Offsite 115 Kilovolt Tramsmission Line - Planning, Preliminary Design, and Environmental Surveys CX(s) Applied: A9, B3.1 Date: 05/20/2014 Location(s): Colorado Offices(s): Golden Field Office
Office of NEPA Policy and Compliance
May 20, 2014NREL National Wind Technology Center Offsite 115 Kilovolt Tramsmission Line - Planning, Preliminary Design, and Environmental Surveys
CX(s) Applied: A9, B3.1
Date: 05/20/2014
Location(s): Colorado
Offices(s): Golden Field Office
The U.S. Department of Energy is proposing to conduct preliminary activities to support the siting, design and installation of an above ground 115 kilovolt interconnection transmission line from a substation located on the National Wind Technology Center (NWTC) to a local utility offsite switchyard to be located south of the NWTC.
CX(s) Applied: A9, B3.1
Date: 05/20/2014
Location(s): Colorado
Offices(s): Golden Field Office
The U.S. Department of Energy is proposing to conduct preliminary activities to support the siting, design and installation of an above ground 115 kilovolt interconnection transmission line from a substation located on the National Wind Technology Center (NWTC) to a local utility offsite switchyard to be located south of the NWTC.