Alfalfa Substation Control House Replacement CX(s) Applied: B4.11 Date: 05/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
May 2, 2014Alfalfa Substation Control House Replacement
CX(s) Applied: B4.11
Date: 05/02/2014
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to o replace the control house at Alfalfa Substation with a larger control house to allow for additional metering, communication equipment, and backup batteries. As part of this action, BPA would remove the old control house once the new control house is in service.
CX(s) Applied: B4.11
Date: 05/02/2014
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to o replace the control house at Alfalfa Substation with a larger control house to allow for additional metering, communication equipment, and backup batteries. As part of this action, BPA would remove the old control house once the new control house is in service.