Mixed Waste Management Facility Cap Drainage Repairs CX(s) Applied: B6.1 Date: 04/28/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
April 28, 2014Mixed Waste Management Facility Cap Drainage Repairs
CX(s) Applied: B6.1
Date: 04/28/2014
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Repair the damaged concrete channels and replace existing weep holes with the new subsurface drainage system behind the existing concrete channel side wall.
CX(s) Applied: B6.1
Date: 04/28/2014
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Repair the damaged concrete channels and replace existing weep holes with the new subsurface drainage system behind the existing concrete channel side wall.