Chehalis-Mayfield Number 1 Line Impairment Structure Replacements CX(s) Applied: B1.3 Date: 04/03/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
April 3, 2014Chehalis-Mayfield Number 1 Line Impairment Structure Replacements
CX(s) Applied: B1.3
Date: 04/03/2014
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to address clearance impairments at two locations on the 230-kilovolt Chehalis-Mayfield Number 1 transmission line. The project involves replacing the wood poles of two existing H-frame wood pole structures, 13/8 and 20/5, in-kind at the same locations but with taller poles.
CX(s) Applied: B1.3
Date: 04/03/2014
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to address clearance impairments at two locations on the 230-kilovolt Chehalis-Mayfield Number 1 transmission line. The project involves replacing the wood poles of two existing H-frame wood pole structures, 13/8 and 20/5, in-kind at the same locations but with taller poles.