Telephone Line Removal Along the Access Road into Wautoma Substation CX(s) Applied: B1.3 Date: 03/17/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
March 17, 2014Telephone Line Removal Along the Access Road into Wautoma Substation
CX(s) Applied: B1.3
Date: 03/17/2014
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to remove approximately 2,000 feet of old telephone line that runs along the access road into Wautoma Substation on BPA fee-owned property.
CX(s) Applied: B1.3
Date: 03/17/2014
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to remove approximately 2,000 feet of old telephone line that runs along the access road into Wautoma Substation on BPA fee-owned property.