Mission Support Alliance Shutdown of Waste Sampling and Characterization Facility CX(s) Applied: B1.28 Date: 04/10/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Office of NEPA Policy and Compliance
April 10, 2012Mission Support Alliance Shutdown of Waste Sampling and Characterization Facility
CX(s) Applied: B1.28
Date: 04/10/2012
Location(s): Washington
Offices(s): River Protection-Richland Operations Office
The Waste Sampling and Characterization Facility will be shut down and placed in an environmentally safe and regulatory compliant configuration.
CX(s) Applied: B1.28
Date: 04/10/2012
Location(s): Washington
Offices(s): River Protection-Richland Operations Office
The Waste Sampling and Characterization Facility will be shut down and placed in an environmentally safe and regulatory compliant configuration.