CX-012058: Categorical Exclusion Determination

Roof Removal and Replacement at +34 and +38, K-Area Materials Storage Building CX(s) Applied: B1.3 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

March 18, 2014
Estimated Read Time   min
Roof Removal and Replacement at +34 and +38, K-Area Materials Storage Building
CX(s) Applied: B1.3
Date: 03/18/2014
Location(s): South Carolina
Offices(s): Savannah River Operations Office

Subcontractor to remove and replace roofs at levels +34 feet and +48 feet of the K-Area Materials Storage Building with a two-ply Styrene-Butadiene-Styrene Modified Bitumen roofing system and vapor barrier.