Deepwater Reverse-Circulation Primary Cementing CX(s) Applied: A9, A11, B3.6 Date: 04/21/2014 Location(s): Texas Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
April 21, 2014Deepwater Reverse-Circulation Primary Cementing
CX(s) Applied: A9, A11, B3.6
Date: 04/21/2014
Location(s): Texas
Offices(s): National Energy Technology Laboratory
This project includes the design, development, and laboratory testing of reverse-circulation primary cementing techniques for use in deepwater wells. The categorical exclusion covers activities to be conducted within a laboratory/office setting that will include numerical modeling, simulations, and laboratory studies.
CX(s) Applied: A9, A11, B3.6
Date: 04/21/2014
Location(s): Texas
Offices(s): National Energy Technology Laboratory
This project includes the design, development, and laboratory testing of reverse-circulation primary cementing techniques for use in deepwater wells. The categorical exclusion covers activities to be conducted within a laboratory/office setting that will include numerical modeling, simulations, and laboratory studies.