Revenue Meter Installation at Wind River Biomass Facility CX(s) Applied: B1.7 Date: 12/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
December 30, 2013Revenue Meter Installation at Wind River Biomass Facility
CX(s) Applied: B1.7
Date: 12/30/2013
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to install a revenue meter at Wind River Biomass Utility LLC's (Wind River) planned 4-megawatt woody biomass facility.
CX(s) Applied: B1.7
Date: 12/30/2013
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to install a revenue meter at Wind River Biomass Utility LLC's (Wind River) planned 4-megawatt woody biomass facility.