P-Area Well Abandonment CX(s) Applied: B3.1 Date: 12/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
December 11, 2013P-Area Well Abandonment
CX(s) Applied: B3.1
Date: 12/11/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
P-Area Soil Vapor Extraction and injection/monitoring wells are no longer required and will be abandoned. The wells will be abandoned by a subcontractor and in accordance with the guidelines contained in Manual 3Q1, Procedure 9010.
CX(s) Applied: B3.1
Date: 12/11/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
P-Area Soil Vapor Extraction and injection/monitoring wells are no longer required and will be abandoned. The wells will be abandoned by a subcontractor and in accordance with the guidelines contained in Manual 3Q1, Procedure 9010.