CX-011668: Categorical Exclusion Determination

Add Blanks in CHEX Ductwork Between FLT-34 and FLT-35 CX(s) Applied: B2.3 Date: 12/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

December 11, 2013
Estimated Read Time   min
Add Blanks in CHEX Ductwork Between FLT-34 and FLT-35
CX(s) Applied: B2.3
Date: 12/11/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office

This activity removes ducting from the CHEX system in C-005.