December 18, 2013Parker-Gila 161 Kilovolt Transmission Line - Structure 109-8 Relocation
CX(s) Applied: B1.3
Date: 12/18/2013
Location(s): Arizona
Offices(s): Western Area Power Administration-Desert Southwest Region
Western Area Power Administration (WAPA) proposes to install a new 230 kilovolt wood H-frame structure adjacent to the existing 161 kilovolt steel H-frame structure 109-8 and rotate the new wood H-frame structure such that the spacing and crossarms are parallel to the Wellton Mohawk canal road.
CX(s) Applied: B1.3
Date: 12/18/2013
Location(s): Arizona
Offices(s): Western Area Power Administration-Desert Southwest Region
Western Area Power Administration (WAPA) proposes to install a new 230 kilovolt wood H-frame structure adjacent to the existing 161 kilovolt steel H-frame structure 109-8 and rotate the new wood H-frame structure such that the spacing and crossarms are parallel to the Wellton Mohawk canal road.