CX-011512: Categorical Exclusion Determination

108-1K Basement Sump Pump Replacement CX(s) Applied: B1.3 Date: 10/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

October 16, 2013
Estimated Read Time   min
108-1K Basement Sump Pump Replacement
CX(s) Applied: B1.3
Date: 10/16/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office

The proposed activity removes the existing sump pumps and replaces them with a submersible pump. The new pump will evacuate the sump's contents to the 105-K Disassembly basin outside weir number 1.