773-A E Wing A-Block Cell Window Replacements CX(s) Applied: B2.1 Date: 10/17/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
October 17, 2013773-A E Wing A-Block Cell Window Replacements
CX(s) Applied: B2.1
Date: 10/17/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The shielded cell windows are in need of restoration due to significant oil leakage causing a loss of visibility through windows, thus degrading capability for continued use of the cell for critical mission needs.