Installation of Manway to H-Canyon Exhaust Tunnel CX(s) Applied: B2.5 Date: 09/19/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
September 19, 2013Installation of Manway to H-Canyon Exhaust Tunnel
CX(s) Applied: B2.5
Date: 09/19/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
An access port (manway) will be created in the sand filter roof to allow for inspection of the H-Canyon exhaust tunnel.