Replace Potable Water Supply Line: Phase Two (Project Modification) CX(s) Applied: B1.3, B1.16, B1.32 Date: 10/24/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
October 24, 2013Replace Potable Water Supply Line: Phase Two (Project Modification)
CX(s) Applied: B1.3, B1.16, B1.32
Date: 10/24/2013
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory
Replace the deteriorated 8 inch iron potable water lines and fire water lines on the R&D plateau. Roadways that are disturbed will be repaved.
CX(s) Applied: B1.3, B1.16, B1.32
Date: 10/24/2013
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory
Replace the deteriorated 8 inch iron potable water lines and fire water lines on the R&D plateau. Roadways that are disturbed will be repaved.