“Nanite” For Better Well-Bore Integrity and Zonal Isolation CX(s) Applied: B3.6 Date: 09/27/2013 Location(s): Hawaii Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
September 27, 2013“Nanite” For Better Well-Bore Integrity and Zonal Isolation
CX(s) Applied: B3.6
Date: 09/27/2013
Location(s): Hawaii
Offices(s): National Energy Technology Laboratory
The overall project goal is to demonstrate the capability of real-time sensing of Nanite for improving the long-term wellbore integrity and zonal isolation in shale gas and applicable oil & gas operations.
CX(s) Applied: B3.6
Date: 09/27/2013
Location(s): Hawaii
Offices(s): National Energy Technology Laboratory
The overall project goal is to demonstrate the capability of real-time sensing of Nanite for improving the long-term wellbore integrity and zonal isolation in shale gas and applicable oil & gas operations.