Dixon Substation Fiber Optic Cable Installation CX(s) Applied: B4.7 Date: 09/24/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
September 24, 2013Dixon Substation Fiber Optic Cable Installation
CX(s) Applied: B4.7
Date: 09/24/2013
Location(s): Montana
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to connect its Dixon Substation to an existing fiber optic cable on the Hot Springs-Rattlesnake line.
CX(s) Applied: B4.7
Date: 09/24/2013
Location(s): Montana
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to connect its Dixon Substation to an existing fiber optic cable on the Hot Springs-Rattlesnake line.