Bryan Mound Brine Disposal Pump Replacement (Install) CX(s) Applied: B5.2 Date: 10/28/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
October 28, 2013"Bryan Mound Brine Disposal Pump Replacement (Install)
CX(s) Applied: B5.2
Date: 10/28/2013
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, materials (except GFE), tools, equipment, and supervision required to replace the existing Bryan Mound brine disposal pumps, BMP- 115 and BMP-116 with two new pumps (supplied as Government Furnished Equipment). Tasks include preparation of existing concrete foundation; fabrication, installation, testing, and coating of new suction and discharge pump piping; installation of new Bryan Mound brine disposal pumps; and recovery of existing pumps as Government Salvage."
CX(s) Applied: B5.2
Date: 10/28/2013
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, materials (except GFE), tools, equipment, and supervision required to replace the existing Bryan Mound brine disposal pumps, BMP- 115 and BMP-116 with two new pumps (supplied as Government Furnished Equipment). Tasks include preparation of existing concrete foundation; fabrication, installation, testing, and coating of new suction and discharge pump piping; installation of new Bryan Mound brine disposal pumps; and recovery of existing pumps as Government Salvage."