Hebo Substation Access Road Maintenance CX(s) Applied: B1.3 Date: 09/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
September 13, 2013Hebo Substation Access Road Maintenance
CX(s) Applied: B1.3
Date: 09/13/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneveille Power Administration (BPA) proposes to perform routine road maintenance including installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas along existing access roads from pole structure 15/3 of BPA’s Boyer-Tillamook line to Tillamook County Public Utility District's Hebo Substation (a distance of about 451 feet).
CX(s) Applied: B1.3
Date: 09/13/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneveille Power Administration (BPA) proposes to perform routine road maintenance including installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas along existing access roads from pole structure 15/3 of BPA’s Boyer-Tillamook line to Tillamook County Public Utility District's Hebo Substation (a distance of about 451 feet).