Chehalis-Raymond Number 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 09/13/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
September 13, 2013Chehalis-Raymond Number 1 Access Road Maintenance
CX(s) Applied: B1.3
Date: 09/13/2013
Location(s): Washington, Washington
Offices(s): Bonneville Power Administration
Bonneveille Power Administration (BPA) proposes to perform routine road maintenance and reconstruction activities along a total of approximately 1.2 miles of existing BPA access roads leading to and along the Chehalis-Raymond No. 1 transmission line right-of-way. Road reconstruction work will occur both on and off the transmission line right-of-way, associated with the following structure locations: 20/2 to 21/3, 27/8 to 28/1, 34/4, 42/2, and 42/3.
CX(s) Applied: B1.3
Date: 09/13/2013
Location(s): Washington, Washington
Offices(s): Bonneville Power Administration
Bonneveille Power Administration (BPA) proposes to perform routine road maintenance and reconstruction activities along a total of approximately 1.2 miles of existing BPA access roads leading to and along the Chehalis-Raymond No. 1 transmission line right-of-way. Road reconstruction work will occur both on and off the transmission line right-of-way, associated with the following structure locations: 20/2 to 21/3, 27/8 to 28/1, 34/4, 42/2, and 42/3.