Swan Valley-Teton Number 1 and Number 2 Access Road Maintenance CX(s) Applied: B1.3 Date: 09/16/2013 Location(s): Idaho Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
September 16, 2013Swan Valley-Teton Number 1 and Number 2 Access Road Maintenance
CX(s) Applied: B1.3
Date: 09/16/2013
Location(s): Idaho
Offices(s): Bonneville Power Administration
Bonneveille Power Administration proposes to perform routine road maintenance including reconstructing, grading, and shaping of roads, placing and compacting of rock surfacing, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas along existing access roads. The work involves approximately 2.5 total miles of road improvement work on roads leading to and along the subject transmission line right-of-way.
CX(s) Applied: B1.3
Date: 09/16/2013
Location(s): Idaho
Offices(s): Bonneville Power Administration
Bonneveille Power Administration proposes to perform routine road maintenance including reconstructing, grading, and shaping of roads, placing and compacting of rock surfacing, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas along existing access roads. The work involves approximately 2.5 total miles of road improvement work on roads leading to and along the subject transmission line right-of-way.