Temporary Modification (ETP-TMC-13-01) to Install an Ultrasonic Sound-Emitting Device to Control Algae in the H-Retention Basin CX(s) Applied: B3.6 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
August 13, 2013Temporary Modification (ETP-TMC-13-01) to Install an Ultrasonic Sound-Emitting Device to Control Algae in the H-Retention Basin
CX(s) Applied: B3.6
Date: 08/13/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
This activity is a temporary modification to install an ultrasonic sound-emitting device to control algae in the H-Retention Basin. An in-line pH probe will be installed on the H-Retention Basin pump transfer piping to measure and record the pH of the basin. Permission from South Carolina Department of Health and Environmental Control was obtained to proceed with this activity as a pilot study.
CX(s) Applied: B3.6
Date: 08/13/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
This activity is a temporary modification to install an ultrasonic sound-emitting device to control algae in the H-Retention Basin. An in-line pH probe will be installed on the H-Retention Basin pump transfer piping to measure and record the pH of the basin. Permission from South Carolina Department of Health and Environmental Control was obtained to proceed with this activity as a pilot study.