Replace B920 Fire Wall Line: Phase Two CX(s) Applied: B1.3 Date: 09/24/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
September 24, 2013Replace B920 Fire Wall Line: Phase Two
CX(s) Applied: B1.3
Date: 09/24/2013
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory
Replace the 8-inch fire water lines and isolation valves to the west of B-920. Roadways which are disturbed due to water line installation are to be repaved.
CX(s) Applied: B1.3
Date: 09/24/2013
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory
Replace the 8-inch fire water lines and isolation valves to the west of B-920. Roadways which are disturbed due to water line installation are to be repaved.