August 6, 2013Curecanti-Lost Canyon 230-Kilovolt Emergency Repairs of Downed Conductor
CX(s) Applied: B1.3
Date: 08/06/2013
Location(s): Colorado
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration (WAPA) maintenance crews responded to an emergency and repaired downed conductor on the Curecanti-Lost Canyon Transmission Line on the span between structures 43/2 and 43/3.
CX(s) Applied: B1.3
Date: 08/06/2013
Location(s): Colorado
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration (WAPA) maintenance crews responded to an emergency and repaired downed conductor on the Curecanti-Lost Canyon Transmission Line on the span between structures 43/2 and 43/3.