Liberty-Parker Dam #2 230-Kilovolt Transmission Line, Optical Power Ground Wire Repair CX(s) Applied: B4.7 Date: 08/22/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Office of NEPA Policy and Compliance
August 22, 2013Liberty-Parker Dam #2 230-Kilovolt Transmission Line, Optical Power Ground Wire Repair
CX(s) Applied: B4.7
Date: 08/22/2013
Location(s): Arizona
Offices(s): Western Area Power Administration-Desert Southwest Region
Western Area Power Administration (WAPA) proposes to bury the optical power ground wire in the static wire associated with the Liberty to Parker Dam #2 230-kilovolt transmission line.
CX(s) Applied: B4.7
Date: 08/22/2013
Location(s): Arizona
Offices(s): Western Area Power Administration-Desert Southwest Region
Western Area Power Administration (WAPA) proposes to bury the optical power ground wire in the static wire associated with the Liberty to Parker Dam #2 230-kilovolt transmission line.