CX-010852: Categorical Exclusion Determination

792-A Sidewalk Installation CX(s) Applied: B1.13 Date: 07/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

July 18, 2013
Estimated Read Time   min
792-A Sidewalk Installation
CX(s) Applied: B1.13
Date: 07/18/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office

A 4-inch-thick concrete sidewalk, with handrails in some areas, will be installed to provide safer access to 792-A.