The proposed action will reconfigure the existing Export Water System at the 181-D Pump House that currently conveys raw water from the Columbia River to the 182-D Reservoirs.
CX(s) Applied: B5.2
Date: 07/22/2013
Location(s): Washington
Offices(s): River Protection-Richland Operations Office
The proposed action will reconfigure the existing Export Water System at the 181-D Pump House that currently conveys raw water from the Columbia River to the 182-D Reservoirs.