CX-010586: Categorical Exclusion Determination

Umatilla Electric Cooperative CX(s) Applied: B4.9 Date: 07/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

July 3, 2013
Estimated Read Time   min
Umatilla Electric Cooperative
CX(s) Applied: B4.9
Date: 07/03/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to allow Umatilla Electric Cooperative to use 0.7 miles of BPA fee-owned right-of-way to construct a portion of a 3-mile, double-circuit 115 kilovolt transmission line.