Pittsburgh Building 84 Gas Line Project CX(s) Applied: B2.5 Date: 06/26/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
June 26, 2013Pittsburgh Building 84 Gas Line Project
CX(s) Applied: B2.5
Date: 06/26/2013
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory
Relocation of above ground natural gas pipeline northwest of Bldg. 84. Removal of approximately 300 feet of existing above ground pipe and installation of approximately 100 feet of above ground pipe.
CX(s) Applied: B2.5
Date: 06/26/2013
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory
Relocation of above ground natural gas pipeline northwest of Bldg. 84. Removal of approximately 300 feet of existing above ground pipe and installation of approximately 100 feet of above ground pipe.