Monroe-Snohomish Expanded Conductor Replacement CX(s) Applied: B4.6 Date: 06/13/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
June 13, 2013Monroe-Snohomish Expanded Conductor Replacement
CX(s) Applied: B4.6
Date: 06/13/2013
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to replace 2.5 inch expanded conductor from Monroe Substation to structure 2/1 on the Monroe-Snohomish 230-kilovolt transmission line.
CX(s) Applied: B4.6
Date: 06/13/2013
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to replace 2.5 inch expanded conductor from Monroe Substation to structure 2/1 on the Monroe-Snohomish 230-kilovolt transmission line.