Glen Canyon Switchyard - 230 Kilovolt Wavetrap Removal - TZ9A2 on the Navajo Line CX(s) Applied: B4.11 Date: 06/21/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Office of NEPA Policy and Compliance
June 21, 2013Glen Canyon Switchyard - 230 Kilovolt Wavetrap Removal - TZ9A2 on the Navajo Line
CX(s) Applied: B4.11
Date: 06/21/2013
Location(s): Arizona
Offices(s): Western Area Power Administration-Desert Southwest Region
Western Area Power Administration (WAPA) proposes to remove 230 Kilovolt wavetrap at the Glen Canyon Switchyard located on the Navajo transmission line.
CX(s) Applied: B4.11
Date: 06/21/2013
Location(s): Arizona
Offices(s): Western Area Power Administration-Desert Southwest Region
Western Area Power Administration (WAPA) proposes to remove 230 Kilovolt wavetrap at the Glen Canyon Switchyard located on the Navajo transmission line.