Chenoweth-Goldendale Number 1 Disconnect Switch Project CX(s) Applied: B4.6 Date: 05/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
May 30, 2013"Chenoweth-Goldendale Number 1 Disconnect Switch Project
CX(s) Applied: B4.6
Date: 05/30/2013
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to construct a new disconnect switch stand and associated line work on its Chenoweth Goldendale Number 1, 115-kilovolt transmission line adjacent to the Bonneville Power Administration Goldendale Substation."