CX-010340: Categorical Exclusion Determination

Badger Canyon-Richland #1 Wood Poles CX(s) Applied: B1.3 Date: 05/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

May 17, 2013
Estimated Read Time   min
Badger Canyon-Richland #1 Wood Poles
CX(s) Applied: B1.3
Date: 05/17/2013
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA), at the expense of the City of Richland, proposes to raise structures 4/9 and 4/10 of the Badger Canyon-Richland #1 115 kilovolt transmission line to provide adequate clearance between the transmission line and the road.