Garrison Substation Access Roads CX(s) Applied: B1.3, B1.13 Date: 05/28/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
May 28, 2013Garrison Substation Access Roads
CX(s) Applied: B1.3, B1.13
Date: 05/28/2013
Location(s): Montana
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes repairing a corrugated metal pipe end; making minor asphalt repairs; and grading, shaping, compacting, and placing road aggregate on 20,005 linear feet of gravel road.
CX(s) Applied: B1.3, B1.13
Date: 05/28/2013
Location(s): Montana
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes repairing a corrugated metal pipe end; making minor asphalt repairs; and grading, shaping, compacting, and placing road aggregate on 20,005 linear feet of gravel road.