A 1,000 Level Drill Pipe Deployed Fiber Optic 3C Receiver Array for Deep Boreholes CX(s) Applied: A9, A11, B3.6 Date: 04/30/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
April 30, 2013A 1,000 Level Drill Pipe Deployed Fiber Optic 3C Receiver Array for Deep Boreholes
CX(s) Applied: A9, A11, B3.6
Date: 04/30/2013
Location(s): Texas
Offices(s): National Energy Technology Laboratory
Field test a five level 3C prototype system.
CX(s) Applied: A9, A11, B3.6
Date: 04/30/2013
Location(s): Texas
Offices(s): National Energy Technology Laboratory
Field test a five level 3C prototype system.