Celilo Fiber System CX(s) Applied: B4.7 Date: 04/15/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
April 15, 2013Celilo Fiber System
CX(s) Applied: B4.7
Date: 04/15/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to install fiber optic cable, and associated vault between three substations (Big Eddy 230-kilovolt (kV) Substation, Big Eddy 500-kV Substation, and Celilo Substation) that are located in the same general vicinity on BPA owned property.
CX(s) Applied: B4.7
Date: 04/15/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to install fiber optic cable, and associated vault between three substations (Big Eddy 230-kilovolt (kV) Substation, Big Eddy 500-kV Substation, and Celilo Substation) that are located in the same general vicinity on BPA owned property.