CX-010139: Categorical Exclusion Determination

Permanent Power for MCU Sampling Building Heating, Ventilation and Air Conditioning and Ancillary CX(s) Applied: B2.5 Date: 03/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

March 7, 2013
Estimated Read Time   min
Permanent Power for MCU Sampling Building Heating, Ventilation and Air Conditioning and Ancillary
CX(s) Applied: B2.5
Date: 03/07/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office

Design and install a permanent welding receptacle capable of providing at least 45 KVA at 480 VAC permanent power near the MCU Sampling Building.