Replacement of the 254-13H Safety Significant (SS) Standby Diesel Generator CX(s) Applied: B1.25 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
March 15, 2013Replacement of the 254-13H Safety Significant (SS) Standby Diesel Generator
CX(s) Applied: B1.25
Date: 03/15/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Replace the existing 254-13H diesel generator to improve overall system reliability.
CX(s) Applied: B1.25
Date: 03/15/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Replace the existing 254-13H diesel generator to improve overall system reliability.