CX-010027: Categorical Exclusion Determination

Removal of Glass Feed Prep System from 786-A (EDL) CX(s) Applied: B1.23 Date: 01/22/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

January 22, 2013
Estimated Read Time   min
Removal of Glass Feed Prep System from 786-A (EDL)
CX(s) Applied: B1.23
Date: 01/22/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office

The small scale Glass Feed Prep System (GFPS) was designed, fabricated and operated in 786-A from 1998-2001 to support testing for DWPF. The GFPS will be disassembled and removed from 786-A in preparation for the CEF melter, which is part of the Alternative Reductant Test Program.