Tucannon River Substation Expansion Project CX(s) Applied: B4.6 Date: 11/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
November 1, 2012Tucannon River Substation Expansion Project
CX(s) Applied: B4.6
Date: 11/01/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
The energized yard at the existing Tucannon River Substation would be expanded to the east approximately 90 feet, and to the north approximately 100 feet to accommodate two new shunt capacitor banks and associated electrical equipment, footings, ground mat, fence, switchyard surface, and drainage features.
CX(s) Applied: B4.6
Date: 11/01/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
The energized yard at the existing Tucannon River Substation would be expanded to the east approximately 90 feet, and to the north approximately 100 feet to accommodate two new shunt capacitor banks and associated electrical equipment, footings, ground mat, fence, switchyard surface, and drainage features.