Replacement of Motor Control Center (MCC) MCC-N2 in 241-29H CX(s) Applied: B1.3 Date: 11/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
November 16, 2012Replacement of Motor Control Center (MCC) MCC-N2 in 241-29H
CX(s) Applied: B1.3
Date: 11/16/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The bus bars in ITE 5600 Motor Control Centers HM-241049-ELNH-MCC-N2 have degraded due to galvanic corrosion. As a result, MCC-N2 (E-E2-H-7846) requires replacement.
CX(s) Applied: B1.3
Date: 11/16/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The bus bars in ITE 5600 Motor Control Centers HM-241049-ELNH-MCC-N2 have degraded due to galvanic corrosion. As a result, MCC-N2 (E-E2-H-7846) requires replacement.