CX-009633: Categorical Exclusion Determination

Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670 CX(s) Applied: B2.5 Date: 11/29/2012 Location(s): Idaho Offices(s): Idaho Operations Office

Office of NEPA Policy and Compliance

November 29, 2012
Estimated Read Time   min
Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670
CX(s) Applied: B2.5
Date: 11/29/2012
Location(s): Idaho
Offices(s): Idaho Operations Office

The purpose of this project is to ensure the concrete masonry unit (CMU) separating the control room and the Reactor Data Acquisition System (RDAS) room located at TRA-670 meets the PC-4 seismic standard.