Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line CX(s) Applied: B1.3, B1.13 Date: 12/19/2012 Location(s): Washington, Idaho Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
December 19, 2012Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line
CX(s) Applied: B1.3, B1.13
Date: 12/19/2012
Location(s): Washington, Idaho
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to perform road maintenance along the Lower Granite-Hatwai 500-kilovolt transmission line access road system. Existing roads will be improved/ reconstructed to the existing width or maximum of 14 feet.
CX(s) Applied: B1.3, B1.13
Date: 12/19/2012
Location(s): Washington, Idaho
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to perform road maintenance along the Lower Granite-Hatwai 500-kilovolt transmission line access road system. Existing roads will be improved/ reconstructed to the existing width or maximum of 14 feet.